Offering summary
Everything a land committee needs on one page.
Figures are taken from the signed preliminary engineering set and the application filed with the City of Bremerton on August 5, 2026. Where a number is not in that record, it is not on this page.
Site and program
- Total site area
- 4.08 acres · 177,663 SF
- Parcels
- 4 assembled parcels
- Parcels 2–4
- 160,425 SF · 3.68 acres · 32 lots
- Parcel 1 (GC frontage)
- 17,238 SF · 6 lots
- Zoning
- R-10 Low Density Residential, with General Commercial frontage
- Tenure
- Fee-simple attached single-family
- Homes
- 38 across 6 plan types
- Impervious area
- 73,751 SF
- Pervious area
- 86,674 SF
- Open space
- 51,922 SF in tracts C through J — 32% against 15% (24,064 SF) required
- Lot landscape area
- 13,820 SF
- Guest parking
- 25 stalls
- Carr Blvd ROW + dedication
- 18,518 SF
- Stormwater
- On-site pond in Tract B
Source: C3.00 Site Plan, N.L. Olson & Associates (project 25-13629), June 23, 2026. Areas and dimensions are preliminary and subject to final design and City conditions.
Transaction
- Asking price
- Price on request
- Closing condition
- Closing upon site plan approval
- Risk allocation
- The seller carries the entitlement to approval; the buyer takes construction permits and post-approval conditions.
- Structures considered
- Offers considered on the land as-is, with entitlements, or vertical-ready.
- Assignment
- Assignment allowed with seller consent
- Diligence
- Full due-diligence package available under NDA.
- Representation
- Sold direct by the owner. No brokerage.
Parcel numbers
- 3719-002-003-0306
- 3719-002-003-0009
- 3719-002-004-0008
- 3719-002-003-0504
Unit mix
- Type A — 24′ × 45′
- 10 × 3 bed · 2-car garage
- Type B — 20′ × 45′
- 12 × 3 bed · 1-car garage
- Type C — 24′ × 45′
- 4 × 3 bed · 2-car rear garage
- Type D — 20′ × 45′
- 4 × 3 bed · 2-car rear garage
- Type E — 15′ × 45′
- 6 × 2 bed · 2-car tandem rear garage
- Type F — 24′ × 30′
- 2 × 2 bed plus office · 1-car garage
- Total
- 38 homes
Entitlement
Where the application stands.
The preliminary plat and site development permit are under review by the City of Bremerton. They are not approved. Closing is conditioned on approval, so the review sits with the seller rather than the buyer.
-
October 2025
Pre-application conference
Complete
Pre-application conference held with the City on the four-parcel assemblage, establishing the plat configuration, frontage improvement scope and open space requirements the June 2026 engineering set was drawn to.
-
June 23, 2026
Preliminary civil improvement plans signed
Complete
Signed preliminary plat map, site plan, storm and grading plan, phasing plan, profiles and sections, together with the geotechnical engineering report, storm drainage analysis and photometric plan.
-
July 29, 2026
SEPA checklist signed
Complete
Environmental checklist executed and submitted with the application package.
-
August 5, 2026
Preliminary plat and site development permit submitted
In review
Full application filed: preliminary plat application, legal descriptions for all four parcels, signed civil improvement plans, geotechnical report, storm drainage analysis, traffic count by Heath & Associates, tree report, photometric plan, utility availability letter, architecture and unit mix. Currently under City review.
-
Next
Preliminary plat approval
Scheduled
The seller's deliverable, and the closing condition on offer. Timing is at the City's discretion and is not warranted.
-
Buyer scope
Civil construction permit
Scheduled
Post-approval conditions, final engineering and the civil construction permit pass to the buyer at closing.
-
Buyer scope
Building permits
Scheduled
Vertical permitting on the buyer's plans and schedule. The architecture set for all thirty-eight homes conveys with the sale.
Questions a buyer asks first
Is the plat approved?
No. The preliminary plat and site development permit were submitted to the City of Bremerton on August 5, 2026 and are under review. The seller carries the entitlement to approval, and closing is conditioned on site plan approval — so the buyer is not taking approval risk, but the approval has not yet issued.
Can the homes be sold fee-simple?
That is the design intent. The plat is laid out as thirty-eight individual lots, and unit lot subdivision is an active part of the entitlement approach, which is what lets a builder convey each attached home fee-simple rather than as a condominium.
What is the six-lot parcel on the frontage?
Parcel 1 is the 17,238 SF parcel carrying the General Commercial frontage designation, laid out with six of the thirty-eight lots. It gives a buyer optionality — for-sale, rental hold, or separate disposition — without disturbing the thirty-two lots on parcels 2 through 4.
What is the finished square footage of each plan?
The preliminary set records building footprints rather than finished area. Footprint dimensions and bedroom counts are published here; the full architecture set, including floor plans and areas for all six plan types, is in the due-diligence package.
Is there a broker?
No. Laughlin Development LLC owns the property and is selling direct. Enquiries go straight to Ian Laughlin.
Development team
Who did the work.
-
Owner and entitlement sponsor
Laughlin Development LLC
Land development and entitlements on the Kitsap Peninsula. Assembled the four parcels, carried the design team and filed the preliminary plat and site development permit. Selling direct — no brokerage.
-
Civil engineering
N.L. Olson & Associates, Inc.
Preliminary plat and site development plans, storm drainage analysis, grading and frontage improvements. Signed set dated June 23, 2026 under project 25-13629.
-
Traffic
Heath & Associates
Traffic count prepared for the August 2026 submittal.
Offers considered on the land as-is, with entitlements, or vertical-ready. Assignment allowed with seller consent. Full due-diligence package available under NDA.