Preliminary plat submitted · under City review

Carr
Boulevard

A 38-home fee-simple townhome site in City review — offered direct, with closing at site plan approval (preferred) or preliminary plat approval.

Site
4.08 acres · 177,663 SF
Zoning
R-10 + General Commercial frontage
Status
Filed August 5, 2026 · under City review
Risk split
Seller carries entitlement review to approval
Top-down aerial rendering of the 38-home Carr Boulevard site plan, with Kitsap Way at the north edge, Carr Boulevard on the west, and the stormwater pond to the east.
Site-plan-based design rendering. Illustrative only — subject to final engineering and City conditions.

The offering at a glance

38
Fee-simple attached homes
4.08 ac
Four assembled parcels · 177,663 SF
R-10
Low density residential + GC frontage
Aug 2026
Preliminary plat and site development permit submitted
6
Plan types, 2 and 3 bedroom
32%
Open space — 51,922 SF of the 160,425 SF on parcels 2–4, against 15% (24,064 SF) required
25
Guest parking stalls
On request
Asking price · close at site plan or preliminary plat approval

Deal terms

A defined path to close.

Full due diligence is available under NDA. The preliminary plat and site development permit remain under City review.

Asking
Price on request
Closing
Closing at site plan approval (preferred) or preliminary plat approval
Seller carries
Entitlement review through preliminary approval
Buyer takes
Construction permits and post-approval conditions
Assignment
Assignment allowed with seller consent
Representation
Owner direct · no brokerage

The opportunity

Thirty-eight homes, engineered and in review, five minutes from the shipyard.

Four parcels on Carr Boulevard at Kitsap Way have been assembled into a single 4.08-acre development site — 177,663 square feet, zoned r-10 low density residential, with general commercial frontage. The plat lays out 38 lots for fee-simple attached single-family homes across six plan types, with 51,922 SF of open space in tracts C through J, 25 guest stalls and a stormwater pond.

The work a builder would otherwise carry has been done. Signed preliminary civil improvement plans, a geotechnical report, a storm drainage analysis, a traffic count, a tree report, a photometric plan, a utility availability letter and full architecture for all thirty-eight homes went to the City of Bremerton on August 5, 2026 with the preliminary plat and site development permit application. That package is in review now.

The offer is structured so that review risk stays with the seller. Closing at site plan approval (preferred) or preliminary plat approval — the seller carries the entitlement to approval; the buyer takes construction permits and post-approval conditions. Unit lot subdivision is an active part of the entitlement approach, which is what lets a builder convey each attached home fee-simple rather than as a condominium.

The six-lot parcel on the commercial frontage carries its own optionality: hold it, build it for sale, or dispose of it separately, without touching the thirty-two lots behind.

Read the full offering summary
Axonometric massing study of the thirty-eight attached homes on the Carr Boulevard plat, with Kitsap Way along the north edge and the private drive loop through the center.
Massing study over the preliminary plat layout. Thirty-two lots on parcels 2–4, six on the General Commercial frontage parcel.

Execution boundary

What is done. What remains.

01

Seller work to date

  • Four-parcel assemblage and 38-home site program
  • Preliminary plat and site development permit submitted August 5, 2026
  • Signed civil set, survey, geotechnical, stormwater, traffic, tree and photometric work
  • Six-type architecture and landscape package

02

Buyer work after approval

  • Satisfy final City conditions and complete post-approval engineering
  • Secure civil construction and individual building permits
  • Finance, build and sell or operate the vertical program
  • Independently verify all plans, costs, conditions and market assumptions

Site plan

Thirty-eight lots, drawn from the civil set.

Geometry taken directly from the signed preliminary plat base drawing, N.L. Olson & Associates project 25-13629. Hover or tap a home for its lot number and plan. Keyboard: Tab into the plan, then ← → to move between lots.

20′ × 45′ 3 bed · 16 homes
24′ × 45′ 3 bed · 14 homes
15′ × 45′ 2 bed · 6 homes
24′ × 30′ 2 bed · 2 homes
Interactive site plan of the Carr Boulevard preliminary plat showing thirty-eight lots grouped in attached buildings around a private drive, with open space tracts and the stormwater pond. The same information is available as a table below. 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Skip the plan and read the unit schedule

Unit schedule

Six types. 38 homes.

The schedule is grouped by unit type. Use the lot menu in each row to find every location where that home is planned.

Six unit types for the Carr Boulevard preliminary plat, with a dropdown listing the lots assigned to each type.
Type Footprint Homes Bedrooms / baths Garage Lot locations
Type A 24′ × 45′ 10 3 bed · 2.5 bath 2-car garage
Type B 20′ × 45′ 12 3 bed · 2.5 bath 1-car garage
Type C 24′ × 45′ 4 3 bed · 2.5 bath 2-car rear garage
Type D 20′ × 45′ 4 3 bed · 2.5 bath 2-car rear garage
Type E 15′ × 45′ 6 2 bed · 2.5 bath 2-car tandem rear garage
Type F 24′ × 30′ 2 2 bed plus office · 2.5 bath 1-car garage

Footprint dimensions are building footprints from the preliminary set, not finished area. Floor plans and finished areas are available in the data room.

The product

Six plan types across 38 homes.

Photorealistic studies based on the elevations filed with the August 2026 application. Building geometry is unchanged; materials and landscaping are illustrative. Counts sum to the full thirty-eight. Every plan is 2.5 bath.

  1. 24′ × 45′ plan type A: 3 bedroom attached home with 2-car garage.

    Type A 10 homes

    24′ × 45′

    3 bed · 2.5 bath

    2-car garage

  2. 20′ × 45′ plan type B: 3 bedroom attached home with 1-car garage.

    Type B 12 homes

    20′ × 45′

    3 bed · 2.5 bath

    1-car garage

  3. 24′ × 45′ plan type C: 3 bedroom attached home with 2-car rear garage.

    Type C 4 homes

    24′ × 45′

    3 bed · 2.5 bath

    2-car rear garage

  4. 20′ × 45′ plan type D: 3 bedroom attached home with 2-car rear garage.

    Type D 4 homes

    20′ × 45′

    3 bed · 2.5 bath

    2-car rear garage

  5. 15′ × 45′ plan type E: 2 bedroom attached home with 2-car tandem rear garage.

    Type E 6 homes

    15′ × 45′

    2 bed · 2.5 bath

    2-car tandem rear garage

  6. 24′ × 30′ plan type F: 2 bedroom attached home with 1-car garage.

    Type F 2 homes

    24′ × 30′

    2 bed plus office · 2.5 bath

    1-car garage

Footprint dimensions are building footprints, not finished area. Floor plans and finished areas for every type are in the architecture set — available in the data room.

Street views

A neighborhood at pedestrian scale.

Preliminary architectural concepts showing the intended variety of attached homes, landscaped walks, and residential streetscapes.

Illustrative design renderings only. Architecture, materials, landscaping, and site conditions remain subject to final engineering, permitting, and builder selections.

Entitlement

Where the application stands.

The preliminary plat and site development permit are under review by the City of Bremerton. They are not approved. Closing is conditioned on approval, so the review sits with the seller rather than the buyer.

  1. October 2025

    Pre-application conference

    Complete

    Pre-application conference held with the City on the four-parcel assemblage, establishing the plat configuration, frontage improvement scope and open space requirements the June 2026 engineering set was drawn to.

    City of Bremerton — Department of Community Development
    City pre-application file BP25 00378

  2. June 23, 2026

    Preliminary civil improvement plans signed

    Complete

    Signed preliminary plat map, site plan, storm and grading plan, phasing plan, profiles and sections, together with the geotechnical engineering report, storm drainage analysis and photometric plan.

    N.L. Olson & Associates, Inc.
    N.L. Olson project 25-13629

  3. July 29, 2026

    SEPA checklist signed

    Complete

    Environmental checklist executed and submitted with the application package.

    City of Bremerton — SEPA responsible official

  4. August 5, 2026

    Preliminary plat and site development permit submitted

    In review

    Full application filed: preliminary plat application, legal descriptions for all four parcels, signed civil improvement plans, geotechnical report, storm drainage analysis, traffic count by Heath & Associates, tree report, photometric plan, utility availability letter, architecture and unit mix. Currently under City review.

    City of Bremerton
    N.L. Olson project 25-13629

  5. Next

    Preliminary plat approval

    Scheduled

    The seller's deliverable. Closing can occur at site plan approval (preferred) or at preliminary plat approval. Timing is at the City's discretion and is not warranted.

    City of Bremerton

  6. Buyer scope

    Civil construction permit

    Scheduled

    Post-approval conditions, final engineering and the civil construction permit pass to the buyer at closing.

    City of Bremerton

  7. Buyer scope

    Building permits

    Scheduled

    Vertical permitting on the buyer's plans and schedule. The architecture set for all thirty-eight homes conveys with the sale.

    City of Bremerton

Location and market

On the Kitsap Way corridor, minutes from the shipyard.

Carr Boulevard sits just off Kitsap Way at Lyle Avenue — the retail spine between downtown Bremerton and Silverdale, with grocery, services and transit on the corridor.

Drive times from Carr Boulevard A schematic diagram, not a map. Carr Boulevard at the center, with approximate drive times to five destinations: Puget Sound Naval Shipyard five minutes, the Bremerton fast ferry seven minutes, Olympic College five minutes, St. Michael Medical Center ten minutes, and the Silverdale retail core twelve minutes. 5 min PSNS / Naval Base Kitsap – Bremerton 7 min Bremerton fast ferry to Seattle 5 min Olympic College Bremerton 10 min St. Michael Medical Center 12 min Silverdale retail core Carr Boulevard
Schematic, not to scale. Drive times are approximate and are offered for orientation only.

Employment

  • 42,700

    Naval Base Kitsap personnel — 24,340 civilian, 18,360 active duty. The county's largest employer.

    Kitsap Economic Development Alliance, Kitsap Top Employers Report · July 14, 2026

  • Up to $30B

    Navy Multi-Mission Dry Dock program. RFP fall 2026, contracts 2027, construction from 2028 for up to ten years.

    Kitsap Economic Development Alliance, Multibillion-Dollar Navy Dry Dock Project · July 21, 2026

  • 2,087 jobs

    St. Michael Medical Center, ten minutes from the site.

    Kitsap Economic Development Alliance, Kitsap Top Employers Report · July 14, 2026

Bremerton market snapshot

$488,829
Typical home value · +1.2% yr
$462,150
Median sale price
$1,940/mo
Average rent · +2.4% yr
9 days
Median time to pending

Zillow Home Value Index and rent data, Bremerton WA · Data through July 31, 2026; median sale June 30, 2026.

New construction nearby

Starting prices at nearby new-construction communities.
BuilderCommunityFromSize
Lennar Stoneridge townhomes, Silverdale $399,950 1,298–1,684 SF
KB Home McCormick Trails, Port Orchard (SFR) $482,950 —
LGI Homes Eldorado (SFR) $505,900 —
Century Communities Sinclair Ridge, Bremerton (SFR) $609,990 —

$634,704 Average Bremerton-area new-home price across 1,223 homes in 317 communities. Fee-simple attached homes with garages at Carr Boulevard sit closest to the shipyard, the ferry and the Kitsap Way corridor.

NewHomeSource new-construction listings, Bremerton area · September 2026.

Development team

Who did the work.

  1. Owner and entitlement sponsor

    Laughlin Development LLC

    Land development and entitlements on the Kitsap Peninsula. Assembled the four parcels, carried the design team and filed the preliminary plat and site development permit. Selling direct — no brokerage.

  2. Civil engineering

    N.L. Olson & Associates, Inc.

    Preliminary plat and site development plans, storm drainage analysis, grading and frontage improvements. Signed set dated June 23, 2026 under project 25-13629.

  3. Traffic

    Heath & Associates

    Traffic count prepared for the August 2026 submittal.

Offers considered on the land as-is, with entitlements, or vertical-ready. Assignment allowed with seller consent. Full due-diligence package available under NDA.

Buyer questions

The first five answers.

Ask the principal →
Is the plat approved?

No. The preliminary plat and site development permit were submitted August 5, 2026 and remain under City of Bremerton review. Closing is conditioned on site plan approval (preferred) or preliminary plat approval.

Are the homes fee-simple?

That is the filed design intent. The program uses a unit-lot subdivision for 38 fee-simple attached single-family homes, subject to City review and final conditions.

What is the frontage-parcel option?

Parcel 1 is a 17,238-SF General Commercial frontage parcel planned for six homes. The seller will consider its separate disposition from the 32-home balance.

What are the finished square footages?

The public plan matrix shows verified building footprints only. Finished floor areas are not stated in the source record; full architectural sheets are available in the data room for buyer verification.

Is a broker involved?

No. Laughlin Development LLC owns the property and is offering it directly. Inquiries go to principal Ian Laughlin.

Due diligence

The whole file, on request.

Everything filed with the City in August 2026, plus the engineering and architecture behind it. Tell us who you are and the package opens — the gate is so we know who is looking, not to keep anyone out.

Request access

Or email ian@laughlindevelopmentllc.com

In the package — 20 documents

Offering package · single PDF

Entitlement 4

  • Preliminary plat application Laughlin Development LLC August 5, 2026 Gated
  • Residential cluster development application Laughlin Development LLC August 5, 2026 Gated
  • Pre-submittal conference report City of Bremerton October 2025 Gated
  • Utility availability letter City of Bremerton 2026 Gated

Civil & Survey 5

  • Preliminary plat map N.L. Olson & Associates, Inc. June 23, 2026 Gated
  • Preliminary civil improvement plans (signed) N.L. Olson & Associates, Inc. June 23, 2026 Gated
  • C3.00 Site plan N.L. Olson & Associates, Inc. June 23, 2026 Gated
  • C5.00 Storm and grading plan N.L. Olson & Associates, Inc. June 23, 2026 Gated
  • Site phasing plan N.L. Olson & Associates, Inc. June 23, 2026 Gated

Environmental 6

  • Preliminary geotechnical engineering report June 23, 2026 Gated
  • Preliminary storm drainage analysis (signed) N.L. Olson & Associates, Inc. June 23, 2026 Gated
  • SEPA environmental checklist (signed) July 29, 2026 Gated
  • Tree report 2026 Gated
  • Traffic count Heath & Associates 2026 Gated
  • Preliminary photometric plan June 23, 2026 Gated

Architectural 2

  • Architecture — unit plans, elevations and mix for all 38 homes 2026 Gated
  • Preliminary landscape plan set September 2026 Gated

Financial 2

  • Civil cost estimate 2026 Gated
  • Land offering summary Laughlin Development LLC September 2026 Open

Title 1

  • Legal descriptions — four parcels August 5, 2026 Gated

Inquiries

Straight to the principal.

No brokerage sits between you and this deal. Ian Laughlin owns the property, filed the application and answers the phone.

Telephone
206.226.1988
Pricing
Price on request · closing at site plan approval (preferred) or preliminary plat approval